100 Street Corridor

We're celebrating the completion of all 5 phases of the 100 Street Corridor Project on Saturday, September 28 from 11am to 1pm.

Join us at the green space at 100 Street and 100 Avenue for:

  • FREE lunch from Knappett Industries
  • Lawn games & doodle board
  • Live music by Jody Peck and ElleScriv
  • Ribbon cutting
  • Project information & swag (with Urban Systems)

Then take a stroll up 100 Street for:

  • FREE face painting at 101 Avenue with Glamorous Faces
  • FREE balloon animals at 103 Avenue with Wigglesworth Creations

Business Crawl Contest

Visit participating local businesses for a chance to win prizes! By visiting participating businesses and scanning the event QR code you will be entered to win gift certificates from participating businesses. The more businesses you visit the more entries you will receive. Plus, some places are offering special sales or draws in-store.

  • Chamber of Commerce (9907 99 Avenue) Shop Local Merchandise
  • Crooked Corner Clothing (10107 100 Street) Free temporary tattoos and fall sale 
  • Subway (10008 97 Avenue)
  • My Sushi (9824 100 Street)
  • Farmhouse on Main (10044 100 Street) Specialty drinks!
  • Headspace Arts (10116 100 Street) Every purchase on Saturday enters to win a paint and build guitar kit! 
  • Neil's Barber Shop (10112 100 Street)
  • North Asian Foods (10016 101 Avenue)
  • Nature's Way Spa & Wellness (9820 101 Avenue) Enter a draw for the new “Hello Fall” room diffuser worth $50
  • 548 Trading Co. (10055 100 Avenue) Opening up on Saturday to join the celebrations!
  • Peace Gallery North (10015 100 Avenue) Final viewing of Donna Bozarth's show titled "Life in Layers"
  • Scoop Clothing (9935 100 Avenue) Check out the new consignment section opened this week!
  • Soul Sweet Café & 250 Pizza (9905 100 Avenue) Play and stay while you eat!
  • Thelma & Marcella’s (9834 100 Avenue) 25% off entire store 

Check back as we confirm more stores! You will be able to pick up a list of participating businesses at the Urban Systems tent at the green space during the event.

Project Background

Beneath 100 Street, the 80-year-old water, sanitary, and storm sewer pipes need replacement. On the surface, the entire roadway and sidewalks will be reconstructed to reflect a high-quality urban design to match the vision created during the 100 Street Corridor Plan Design Charrette that took place in 2019.

You will see features such as:

  • Wider sidewalks to accommodate pedestrians and winter snow management
  • Boulevard trees with an automated irrigation system
  • New benches and furnishings
  • Decorative lighting which improves visibility, but also helps create a safer street
  • Left-hand turn lanes to make vehicle movements easier
  • Dedicated space for roadway snow storage

Funding

This project is primarily funded through the Peace River Agreement with additional funds coming from water and sewer reserves. 

Project Phasing

 

The 100 Street Corridor improvements run along 100 street from 96 Avenue to 105 Avenue and are planned to be phased over several construction years:

  • 2020 | Phase 1 - 100 Street and 96 Avenue intersection upgrades and off-street improvements to support future phases
  • 2021 | Phase 2 - 96 Avenue to 99 Avenue
  • 2022 | Phase 3 - 99 Avenue to 101 Avenue
  • 2023 | Phase 4 - 101 Avenue to 103 Avenue
  • 2024 | Phase 5 - 103 Avenue to 105 Avenue